  1. MilestoneWhiteside Cove Residence
    WHWade · 12 hr ago

    Good crew day starting. Sheathed and taped the last gable end. The Whiteside face is catching the morning light off the back deck now.

    Jobsite photo · Cashiers
  2. NoteWildcat Cliffs Lodge
    DFDale · yesterday

    Cabinet crew starts Monday. Staged the boxes in the garage, out of the finish traffic.

  3. InspectionWhiteside Cove Residence
    WHWade · yesterday

    County framing inspection is set for Wednesday. Punch-listed a few strap-nailing spots for the crew this morning so we pass clean.

  4. NoteWhiteside Cove Residence
    WHWade · 2 days ago

    Walked the window openings with the installer ahead of next week. Rough openings all check out against the order.

  5. Weather delayTrillium Ridge House
    CRCody · 2 days ago

    Rain all week held the footings inspection. County can not get out until the ground firms up, so I rescheduled and let the Benoits know the slab date moves with it.

  6. MilestoneWildcat Cliffs Lodge
    DFDale · 3 days ago

    Trim carpentry wrapped in the great room. The coffered ceiling detail came out exactly like the drawings.

    Jobsite photo · Highlands
  7. Weather delayWhiteside Cove Residence
    WHWade · 3 days ago

    Marble supplier pushed the primary bath stone about two weeks. Not on the critical path yet, flagging it early so the Harlans hear it from us first.

  8. NoteLake Glenville Retreat
    CRCody · 4 days ago

    Soil test results are back. Bearing is good right where the engineer wanted the footings, no surprises to design around.

  9. Building scienceWhiteside Cove Residence
    WHWade · 4 days ago

    Walked the pre-insulation air-sealing plan with the framer. Bottom plates and every band-joist penetration get sealed before rough-in so the envelope tests tight.

  10. MilestoneWhiteside Cove Residence
    WHWade · 5 days ago

    Roof is dried-in. Ice-and-water shield down at every eave and valley, synthetic underlayment over the field. The house is weather-tight ahead of the front coming through Thursday.

    Jobsite photo · Cashiers
  11. Building scienceWildcat Cliffs Lodge
    DFDale · 5 days ago

    Blower-door test came back at 1.8 ACH50, well under target for this envelope. The HERS rater was pleased with the closed-cell at the roof deck.

  12. MilestoneTrillium Ridge House
    CRCody · 6 days ago

    Footings poured on the north wing. Clean pour and good consolidation, no cold joints.

    Jobsite photo · Cashiers
  13. MilestoneLake Glenville Retreat
    CRCody · 8 days ago

    Erosion control and tree protection are in. Ready for the driveway cut the moment the permit clears.

    Jobsite photo · Glenville
  14. MilestoneWhiteside Cove Residence
    WHWade · 16 days ago

    Framing topped out. Ridge is set and the roof line matches the render the Harlans fell for.

    Jobsite photo · Cashiers